Drain mat:

With a width of 1 m and a total area of ​​15 m², the Drainage mat PLUS offers optimal protection against waterlogging under the terrace/balcony covering.

The drainage mat PLUS can be laid under drainage screed or gravel.

This mat forms effective drainage between the building waterproofing and the covering structure above.

With the DR100++ drainage membrane you will find an alternative item in our shop.

Draining mat PLUS properties:

Material Polyethylene
Material thickness 8 mm
Length 15 m
Width 1 m
Total area 15 m²

Craft tools

Alle anzeigen

Correct installation of the drain Mat PLUS:

First of all, it must be ensured that the substrate is properly sealed and has a slope of approx. 2%. The waterproofing and decoupling membrane is ideal for waterproofing.

  1. Cutting the mat to size: The first step is to cut the mat to size. Mat joints must be overlapped by 3 rows of studs, which must be taken into account when cutting to size.
  2. Laying the mat: The Drainage Mat PLUS is simply laid loosely on the previously sealed surface with the fleece facing upwards. The laying direction is irrelevant. Adjacent mats are overlapped with a width of 3 rows of studs.
  3. Seal wall connections: If necessary, wall connections can be sealed with DURAL WP sealing tape and flexible mortar

The rest of the covering construction can be started after installati

Correct installation of the drain Mat PLUS:

First of all, it must be ensured that the substrate is properly sealed and has a slope of approx. 2%. The waterproofing and decoupling membrane is ideal for waterproofing.

  1. Cutting the mat to size: The first step is to cut the mat to size. Mat joints must be overlapped by 3 rows of studs, which must be taken into account when cutting to size.
  2. Laying the mat: The Drainage Mat PLUS is simply laid loosely on the previously sealed surface with the fleece facing upwards. The laying direction is irrelevant. Adjacent mats are overlapped with a width of 3 rows of studs.
  3. Seal wall connections: If necessary, wall connections can be sealed with sealing strip WP and flexible mortar

The rest of the covering construction can be started after installation.